Owners called us after the previous contractor walked. Three months in, drywall up but no inspection, no schedule, and an HVAC plan that was going to cost them their summer. We pulled permits, re-sequenced the trades, and hit certificate of occupancy by Labor Day. Original plaster on the front rooms stayed. Everything behind it didn't.
“They were the third GC we talked to. The first one we trusted within ten minutes.”— J.M., Doylestown
Tell us the basics. We’ll walk it and write you a real scope.